TY - JOUR AU - Oliinichenko, V. PY - 2016/06/23 Y2 - 2024/03/28 TI - Analysis of technical requirements for heating mains in geothermal heating supply systems JF - Vidnovluvana energetika JA - VE VL - 0 IS - 2 (45) SE - Geothermal Energy DO - UR - https://ve.org.ua/index.php/journal/article/view/124 SP - 65-72 AB - The article suggests a review of existing methods to transfer coolants from generating source to heat consumers. There have been analyzed technical requirements for heating mains as well as requirements to reduce heat losses in heat transmission process over long distances. The main objective of the article was determining a maximum expedient distance to transport thermal energy and transporting features for geothermal heat carrier over long distances. ER -