(1)
Rokhman, B. INVESTIGATION OF VARIOUS SCHEMES FOR RECONSTRUCTING OF THE DESIGN DUST PREPARATION SYSTEM WHEN CHANGING THE TPP-210A STEAM GENERATOR OPERATION OF THE TRYPILLIA TPP BLOCK 4 FROM BURNING ANTHRACITE CULM TO BURNING G AND DG-1. VE 2017, 06-26.