[1]
B. Rokhman, “INVESTIGATION OF VARIOUS SCHEMES FOR RECONSTRUCTING OF THE DESIGN DUST PREPARATION SYSTEM WHEN CHANGING THE TPP-210A STEAM GENERATOR OPERATION OF THE TRYPILLIA TPP BLOCK 4 FROM BURNING ANTHRACITE CULM TO BURNING G AND DG-1”, VE, no. 4 (51), pp. 06-26, Dec. 2017.